We have installed the newly refinished clawfoot bathtub, along with the sink and toilet.  This remodel also included retexturing and fixing all flaws on the walls, and painting.  Installed picture frame paneling, which I designed.  Client is very happy with the finished product, and we are doing another unit in the same building.  In this [...]

Read Full Post »

Bathroom

A gut and remodel of a 7×7 bathroom in San Francisco. We are not done but it is ready for paint. New tub , 
sink and toilet will be installed after paint

Read Full Post »

The deck job

e took a small 7×6′ space and built a deck in SF.  We removed an existing window and installed a small door out onto the new deck.  Adjacent to the new door, we removed a fixed window, installing the previously removed working window in its place.  From start to finish, the entire job took 4 days to [...]

Read Full Post »