The final process of the bathroom remodel requires attention to detail. 
Grouting of tile, priming and painting, installation of baseboards and fixtures.  About 4 days of work. 
 
 
Proper lay-out of tile to center of shower enclosure is important.
Centering the room for the tile floor makes the room look more uniform, so that your reveals are even all [...]

Read Full Post »

A bid for a bathroom remodel is based on multiple factors – square footage, time, materials, electrical, plumbing, permits, design, etc…  Some people might assume that a remodel of a standard-sized bathroom (5×8′) would be a quick and easy job, when in fact, it can be just as time-consuming as the remodel of a much larger bathroom.  [...]

Read Full Post »