The final process of the bathroom remodel requires attention to detail.
Grouting of tile, priming and painting, installation of baseboards and fixtures. About 4 days of work.
Proper lay-out of tile to center of shower enclosure is important.
Centering the room for the tile floor makes the room look more uniform, so that your reveals are even all [...]
Archive for March, 2009
Knowing your bathroom remodel – Part 2
Posted in Uncategorized on March 29, 2009 | Leave a Comment »
Knowing your bathroom remodel
Posted in Uncategorized, tagged bathroom, remodel, tile on March 22, 2009 | Leave a Comment »
A bid for a bathroom remodel is based on multiple factors – square footage, time, materials, electrical, plumbing, permits, design, etc… Some people might assume that a remodel of a standard-sized bathroom (5×8′) would be a quick and easy job, when in fact, it can be just as time-consuming as the remodel of a much larger bathroom. [...]