The final process of the bathroom remodel requires attention to detail.
Grouting of tile, priming and painting, installation of baseboards and fixtures. About 4 days of work.
Proper lay-out of tile to center of shower enclosure is important.
Centering the room for the tile floor makes the room look more uniform, so that your reveals are even all [...]
Archive for the ‘Uncategorized’ Category
Knowing your bathroom remodel – Part 2
Posted in Uncategorized on March 29, 2009 | Leave a Comment »
Knowing your bathroom remodel
Posted in Uncategorized, tagged bathroom, remodel, tile on March 22, 2009 | Leave a Comment »
A bid for a bathroom remodel is based on multiple factors – square footage, time, materials, electrical, plumbing, permits, design, etc… Some people might assume that a remodel of a standard-sized bathroom (5×8′) would be a quick and easy job, when in fact, it can be just as time-consuming as the remodel of a much larger bathroom. [...]
Work
Posted in Uncategorized, tagged Build, Carpenter, Construction, Job, Work on January 30, 2009 | Leave a Comment »
Man I get my permit tomorrow so I can do this small job I have . Yee Haw
Bathroom completed
Posted in Uncategorized, tagged Add new tag, bathroom, bedroom, kitchens, room, space on September 30, 2008 | Leave a Comment »
We have installed the newly refinished clawfoot bathtub, along with the sink and toilet. This remodel also included retexturing and fixing all flaws on the walls, and painting. Installed picture frame paneling, which I designed. Client is very happy with the finished product, and we are doing another unit in the same building. In this [...]
Bathroom
Posted in Uncategorized on September 19, 2008 | Leave a Comment »
A gut and remodel of a 7×7 bathroom in San Francisco. We are not done but it is ready for paint. New tub ,
sink and toilet will be installed after paint
The deck job
Posted in Uncategorized, tagged deck, doors.windows, san francisco on September 7, 2008 | Leave a Comment »
e took a small 7×6′ space and built a deck in SF. We removed an existing window and installed a small door out onto the new deck. Adjacent to the new door, we removed a fixed window, installing the previously removed working window in its place. From start to finish, the entire job took 4 days to [...]
Job update
Posted in Uncategorized on August 29, 2008 | 1 Comment »
We are wrapping up our Banks Street project, which was an 800 sq. ft. remodel. We’ve started a new project in North Beach – a small, 7×6 deck.
About Us
Posted in news, tagged bay area, bidding, bids, builder, carpentry, contractor, framing, home, jason lord, jpl construction, oakland, remodel, remodelling, residential on June 30, 2008 | 1 Comment »
JPL Construction prides itself on being a very detail-oriented company, with a focus on working hand-in-hand with the client on their project.
We specialize in:
Additions; Victorian home remodel/renovation; dry rot repair; kitchen/bath remodels; stairs; door & window installation; built-in cabinetry; custom shelving; all interior and exterior trim work; decks; siding; fences; retaining walls; brick, block & [...]